How Long Will My Water Job Take?
4/18/2022 (Permalink)
After arriving onsite to water damage, many times while getting started the first question a customer will ask is, "how long will this take?" We here at SERVPRO of Jonesboro know that your time is valuable, we want to get the job done as fast as possible and make you say it looks "Like it never even happened."
The typical timeline for a water job is 3-5 days. The first day of contact with us is all about stabilization. At this point, there often has not been enough time to be in touch with insurance agents and adjusters to figure out what we are allowed to proceed with. To stabilize the situation, we set up equipment and extract standing water if possible.
If adjuster contact is made on day 1 or possibly on day 2 we will be clear as to what we are allowed to tear out and fix. We begin that work and continue drying the affected area. Days 2-5 are dedicated to drying and monitoring your job.
After the job has been completed, the last step is for us to pick up our equipment, have the final paperwork signed and send billing. That is how simple a job handled by SERVPRO of Jonesboro can be.
Our technicians are here to help, call today for all your water damage needs.
(870)934-0501